Environmental statements
- Bristol Deep Sea Container Terminal
Environmental Statement (PDF 337 MB, opens in new window) [Please note large file size]
All supporting documents via this link
Environmental Statement Non-Technical Summary (PDF 3.2 MB, opens in new window)
- Cowes Outer Harbour Project
Environmental Statement (PDF 3.2 MB)- Appendices for this statement are available but have not been posted to the web site due to the large size of some files. If you would like to receive this information on a disk, please contact the Marine Consents Team.
- Gateway Sub-sea Gas Storage
Environmental Impact Assessment (EIA) Consent Decision (PDF 558 KB)
Non Technical Environmental Statement - October 2007 (PDF 2.2 MB, opens in new window)
Supplementary information - June 2008 (PDF 7.7 MB, opens in new window)
Pipeline Anchoring Risk Assessment (PDF 610 KB, opens in new window)
- Grimsby RO-RO Berth
Environmental Statement (PDF 30 MB)
- Immingham Oil Terminal Approach Channel Dredging
- January 2009
Environmental Statement (PDF 59 MB) [NB Large file size]
- The London Array Windfarm
- June 2005
Please click here for further information
- Marchwood, Southampton - Construction of a 270 Berth Marina at Husbands Shipyard
Environmental Statement (PDF 145 KB)
- Meridian (Port) Project
Onshore Environmental Statement (8 MB)
Offshore Environmental Statement (11.6 MB)
Appendix A (19.7 MB)
Appendix B (42.4 MB)
Appendix C (14.7 MB)
Appendix C Chart 1 (2.1 MB)
Appendix C Chart 2 (2.5 MB)
Appendix C Chart 3 (2.3 MB)
Appendix D (3.8 MB)
Appendix E (5.4 MB)
Appendix F (5.4 MB)
Appendix G (101 KB)
- Mostyn, Port of - Channel Dredging Environmental Statement
- October 2007
Please click here for further information
- Mostyn, Port of - Modification of an existing berth
Environmental Statement (PDF 4.9 MB)- Appendices for this statement are available but have not been posted to the web site due to the large size of some files. If you would like to receive this information on a disk, please contact the Marine Consents Team.
- Pembroke Power Station
Please click here for further information
- Construction works to extend existing harbour facilities at Penzance
- This environmental statement is available but it has not been posted to the web site due to the large size of the file. If you would like to receive this information on a disk, please contact the Marine Consents Team.
- Proposed Isle of Portland Natural Gas Storage Facility and Mappowder to Portland Gas Pipeline Project
- March 2007
Environmental Statement* (PDF 137 MB)
Appendices 3.2.1 - 3.3.14*, Appendices 3.5.1 - 3.15.1*- * Please note, due to the large sizes of the above files, we are unable to publish these on our web site. Please contact the Marine Consents Team for copies of these files to be sent to you on disk.
Appendix 3.4.1 - Portland Gas Pipeline, Final Report (PDF 51 MB) [Please note large file size]
Appendix 3.4.2 - Desk Study for Potential Historic Muntions Contamination (PDF 6.1 MB)
Appendix 3.4.3 - Noise Desktop (PDF 160 KB)
Appendix 3.4.4 - Marine Water Quality Sampling Report, Final Report Rounds 1 - 4, September 2005-2006 (PDF 1.3 MB)
Appendix 3.4.5 - Sediment Quality Report (PDF 1.3 MB)
Appendix 3.4.6 - Brine Analysis (PDF 237 KB)
Appendix 3.4.7 - Upper Osprey Gas Storage Project (PDF 5.9 MB)
Appendix 3.4.8 - Intertidal Habitat Survey (PDF 9.9 MB)
Appendix 3.4.9 - Drop Down Video Survey (PDF 4.3 MB)
Appendix 3.4.10 - Benthic Marine Ecology (PDF 3.8 MB)
Appendix 3.4.11 - Seagrass Survey (PDF 433 KB)
Appendix 3.4.12 - Marine Mammal Desktop (PDF 5 MB)
Appendix 3.4.13 - Shipping and Navigation Desktop (PDF 2 MB)
Appendix 3.4.14 - Fisheries Desktop Study (PDF 2.1 MB)
- Portland Harbour Authority Ltd
Please click here for further information
- Port of Southampton - Environmental Statement
- Applications to undertake Dredging, associated Disposal and Construction at the Port of Southampton
- Associated British Ports (ABP) has applied to the Marine and Fisheries Agency (acting on behalf of the Secretary of State for Environment, Food and Rural Affairs) for consents under the Coast Protection Act 1949 and the Food and Environment Protection Act 1985 under three applications to undertake dredge and associated works.
- 1. The dredge of Port of Southampton approach channel within Southampton Water and the Solent, in order to to improve the access for vessels entering and leaving the port, and deposit this dredged material in Nab Disposal Grounds.
- 2. The dredge of Berths 201 and 202 within the Port of Southampton in order to improve the capacity of the berths for larger container ships, and deposit of this dredged material in Nab Disposal Ground.
- 3. The reconstruction of the quay wall at Berths 201 and 202.
- All three projects are subject to Environmental Impact Assessment in accordance with Directive 85/337/EC (as amended) and ABP have supplied an Environmental Statement pursuant to the Marine Works (Environmental Impact Assessment) Regulations 2007.
- These can be viewed through the links below:
Berth 201/202 Works: Vol 1, Main Document (PDF, 24 MB) (opens in new window)
Berth 201/202 Works: Vol 2, Appendices (Compressed file, 22.4 MB)
Southampton Approach Channel Dredge: Vol 1, Main Document (PDF, 21 MB) (opens in new window)
Southampton Approach Channel Dredge: Vol 2, Appendices (Compressed file, 58.9 MB) [NB Large file size]- These documents can also be viewed on ABP's website at www.southamptonvts.co.uk (opens in new window)
- Portsmouth Harbour - Trafalgar Wharf
Environmental Statement for Proposed Pontoons and Dredge (PDF 0.97 MB)
Advert for pontoon (PDF 22 KB)
Advert for dredging (PDF 22 KB)
- Preesall Saltfield, Lancashire - Proposed Natural Gas Storage Facility
Environmental Statement - Non-technical summary (PDF 13 MB)
Environmental Statement - Vol 1 (PDF 4 MB)
Environmental Statement - Vol 1A, Figures [This file is 918 MB - Please email us if you would like figures and illustrations sent to you on disc]
Environmental Statement - Vol 2A, Supporting Technical Information (PDF 106 MB)
Environmental Statement - Vol 2B, Supporting Technical Information (PDF 103 MB)
Addendum to the 2009 Environmental Statement (PDF, 116 MB)
- QEII Berth Development - PD Teesport
Environmental statement consent decision (PDF 151 KB)
Environmental statement (PDF 5 MB)
Non-technical summary (PDF 421 KB)
Appendices (PDF 6.8 MB)
- Construction works to extend existing harbour facilities at St Mary's, Isles of Scilly
- This environmental statement is available but it has not been posted to the web site due to the large size of the file. If you would like to receive this information on a disk, please contact the Marine Consents Team.
- Titchwell Marsh RSPB Reserve, North Norfolk
Environmental statement - November 2008 (PDF 58 MB, opens in new window) [Please note large file size]
Non-technical environmental statement - November 2008 (PDF 4 MB)
- Wallasea Island Wild Coast Project
Environmental statement (PDF 88 MB) [Please note large file size]
Environmental statement - Appendices (PDF 47 MB) [Please note large file size]
Additional information - Response to concerns raised by the Kent and Essex Sea Fisheries Committee (KESFC) (PDF 8 MB)
- Wells Channel Deepening and Jetty Project
Environmental statement consent decision (PDF 270 KB, opens in new window)
Environmental statement (PDF 30 MB, opens in new window)
Appendix A - EX6006 Dredging Research (PDF 12 MB)
Appendix B_- Wells Summary Water Quality Data and Cefas (PDF 478 KB)
Appendix C_- Condition of Designated Site (PDF 107 KB)
Appendix D_- Post and Pre Trial Raw Data (PDF 61 KB)
Appendix E - Relative Sensitivity (PDF 268 KB)
Appendix F - Benthic Biological Resource Survey (PDF 2.1 MB)
Appendix G - Bird Count High Water - Raw Data (PDF 217 KB)
Appendix H - Bird Species Graphs (PDF 1 MB)
Appendix I - Bird Count Low Water - Raw Data (PDF 120 KB)
Appendix J - Bird Distribution Maps (PDF 9.3 MB)
Appendix K - Bird Survey Report (PDF 128 KB)
Appendix L - Public Information Day (PDF 47 KB)
- Weston-Super-Mare, Grand Pier - DC 8585; 34298/090112
Environmental statement (PDF 26 MB, opens in new window) [Please note large file size]
Environmental statement - Supporting appendices (PDF 59 MB, opens in new window)

